5 Bedroom House
£1,299,000
Russwell Lane, Little Brickhill, MK17

Floorplans For Russwell Lane, Little Brickhill, MK17
EPC Graph for Russwell Lane, Little Brickhill, MK17

Description


A thoughtfully modernised five bedroom barn conversion offering versatile living space with a double garage, private driveway parking and mature gardens on the outskirts of a village. Nestled behind clipped hedging and approached via a private gravel driveway, The Barn was redeveloped in the late 1990s and modernised since, it now offers 2,893 sq. ft. of versatile living space across two floors. The ground floor is filled with character, featuring a double-height entrance hallway, dual-aspect sitting room with exposed ceiling beams and a brick fireplace with log burner, a formal dining area, and a separate study. The well-appointed kitchen/breakfast room is complemented by an adjacent utility room. Also on the ground floor are two double bedrooms, a four-piece family bathroom, and guest cloakroom.
Upstairs, the principal bedroom offers a private sanctuary with its own en suite bathroom and a dressing area with fitted wardrobes. Two additional bedrooms and a modern family bathroom complete the first-floor accommodation.
Outside, the property benefits from parking and a detached double garage, all set within a peaceful and private setting.

Kitchen/Breakfast room    An angled walk through from the entrance hall, accesses the dual aspect kitchen/breakfast room which is fitted with a contemporary range of gloss fronted wall base units with contrasting worksurfaces and an inset Butler’s sink with a Pronteau hot water tap. A matching central island has an inset induction hob and breakfast bar seating. Appliances include a Neff microwave/oven/dish warmer, a Britania (double nn) range oven and a Zanussi dishwasher. As well as windows on two sides and an external glazed door with a glazed flanking panel, there are Velux windows in the vaulted ceiling which has exposed beams

Outside    The private established rear garden is laid mainly to lawn with landscaped beds and borders planted with mature trees and shrubs. There are various paved patio and seating areas for relaxation and entertaining, including a raised terrace with steps down to the lawn. The garden has a wooden archway and the driveway is partially enclosed by clipped hedges. From the garden there are far-reaching views across open countrywide.

Situation and Schooling    Little Brickhill has a public house, a church, farm shop and bus services to Luton and Milton Keynes. Nearby Woburn, Bletchley, and Fenny Stratford have numerous shops, restaurants, and leisure facilities. Rail services from Bletchley, Leighton Buzzard or Milton Keynes (London Northwestern, Avanti West Coast) are in easy reach connecting London Euston in as little as 34 minutes. Harlington Thameslink is a 25-minute drive. The house is in catchment for High Ash Church of England Primary school and the Aylesbury grammar schools and is served by dedicated bus services to Bedford schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250165

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields