Description
A modern four bedroom detached house with a garage, driveway parking, and front and rear gardens. This property has approximately 1,222 sq. ft. of accommodation arranged over two floors. On the ground floor there is an entrance hall with stairs to the first floor, two reception rooms, an open plan kitchen/dining room with an adjacent utility room, and a downstairs cloakroom.
Leading off the first floor landing, the principal bedroom has a three piece en-suite shower room. There are three further bedrooms and a family bathroom with a bath with an overhead shower.
At the front of the property is a low maintenance garden. There is a driveway at the side leading to the detached garage. The rear garden is laid mainly to lawn with shrubs and planted borders. Adjacent to the house is a decked terrace and steps lead down to a gravelled area on a lower level.
Ground Floor The dual aspect sitting room has a fireplace fitted with a contemporary fire. Also dual aspect, the open plan kitchen/dining room is over 20 ft. long and has French doors opening to the terrace and rear garden from the dining area. The kitchen is fitted with a range of wall and base units, with contrasting work surfaces, an inset stainless steel sink and various integrated appliances. The peninsular has breakfast seating and a door accesses the adjacent utility room with further units and doors to the side of the house and the cloakroom.
Situation and Schooling Houghton Regis is a town of about 17,280 residents. It has the Bedford Square shopping centre, a Morrisons supermarket, two petrol stations, a range of local shops, businesses, and professional services, eight schools and Dunstable college. There is also a leisure centre, medical practitioners, a library, community facilities including the Memorial Hall and the Angels Lane Community Centre. There are also open spaces, parks and recreation grounds, and sporting facilities.