A Grade II listed four bedroom semi detached house with an enclosed rear garden and off street parking situated in the centre of Woburn. Built in the 17th century, this property has a later Georgian brick façade under a clay tile roof and has been extended and sympathetically modernised. It has 2,077 sq. ft. of accommodation arranged over four floors and is situated in the centre of Woburn, a short walk from all amenities. On the ground floor there is a sitting room with two decorative fireplaces, a snug with a log burner, and a TV room with a log burner and French doors to the patio. The vaulted conservatory/dining room has a French door opening to the patio, and a modern kitchen/breakfast room accesses a utility room with a cloakroom.
On the first floor there are three bedrooms, two overlooking the rear garden and a five piece family bathroom. The second floor has the principal bedroom with an en suite shower room.
The property has two front doors (currently not used), two staircases, and two cellars.
Ground Floor The kitchen/breakfast room has a vaulted ceiling with exposed beams and is fitted with a range of Shaker style painted wall and base units, a dresser unit, granite worktops, and an inset ceramic sink set in a peninsular. Neff appliances include a double oven, a microwave/oven, a coffee machine, a dishwasher and an under counter fridge. A door leads through to the utility room where there is space for a free-standing fridge/freezer. French doors from the kitchen open to the patio.
Outside A drive through an archway from Bedford Street leads to the cobbled courtyard parking area behind the house. The brick walled and fenced rear garden is laid mainly to lawn and is planted with mature trees and shrubs. There is a paved patio that runs along the side and rear of the house, a built-in barbeque, and an outside kitchen area.
Situation and Schooling Woburn village has attractions including Woburn Abbey and Safari Park, the Georgian Centre, and the Woburn Heritage Centre. There is a heated outdoor swimming pool, a village hall, and shops, restaurants, and public houses. Woburn also has a monthly farmers' market. There is a lower school in Woburn and primary and extended secondary schools in Woburn Sands.