Description
A 1930s four bedroom detached house with a contemporary open plan living area, off street parking, a double garage with workshop, and mature gardens in a village location. This brick under slate property has approximately 2,073 sq. ft. of versatile accommodation arranged over two floors. On the ground floor there is an entrance hall with the staircase to the first floor and a door to garage, a cupboard, a shower room, and doors to a sitting room, a study with an open fire, and the open plan kitchen/dining/family room which accesses the utility room. The open plan living area has two sets of French doors opening to the garden and two skylights.
The first floor landing accesses all four bedrooms. The over 21 ft. long principal bedroom has a walk-in dressing area and an en suite shower room. There are three further bedrooms; bedroom three has a bay window overlooking the front and a range of fitted wardrobes. There is a four piece and a family bathroom.
A shared driveway leads to the parking area ahead of the oversized double garage.
Kitchen/Dining/Family Room The kitchen area is fitted with a range of gloss fronted base and wall units with Corian worktops and an inset sink with a multifunctional Quooker tap with boiling water. Integrated Bosch appliances include an oven, a microwave, a gas hob, an extractor, and a dishwasher. There is also a fridge/freezer. An oak breakfast bar separates the kitchen from the dining area which has two sets of French doors, with windows in between, opening to the garden. There is a range of bookshelves in the family room and the same flooring runs through the entire living space.
Outside A gate leads to the front garden which is enclosed by a clipped hedge and at the side by a brick wall with mature shrubs. The established rear garden is laid mainly to lawn with a paved patio adjacent to the house. There are mature trees, shrubs and hedging, well stocked flower beds and borders along with raised vegetable beds. A path leads though the garden to a decked patio at the bottom.
Situation and Schooling Bow Brickhill is a small village with a 'gastro pub', The Wheatsheaf, and Bow Brickhill C of E primary school. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, and public houses. There are doctorsÂ’ and dentists' surgeries. Further schooling can be found at Swallowfield primary school and Fulbrook extended secondary school.