Description
A Victorian refurbished two double bedroom semi detached cottage with a landscaped rear garden, within walking distance of village amenities. The property has 775 sq. ft. of accommodation over two floors. On the ground floor there is a sitting room with a feature fireplace and a wood burning stove, a re-fitted kitchen/breakfast room, a pantry, an inner lobby, a refitted ground floor bathroom, and a conservatory. The first floor has two double bedrooms.
There is a private landscaped rear garden with a seating and BBQ area, a shingled area, a small pond, mature borders, and a timber built storage shed.
Ground Floor Highlights The dual aspect sitting room has a feature brick chimney breast with an inset wood burning stove. The kitchen is fitted with a range of base units, with complementary work surfaces incorporating a butler sink and a range cooker. There is a stable door to the garden and a walk-in pantry. The conservatory overlooks the rear garden.
Situation and Schooling Bow Brickhill is a small village with The Wheatsheaf gastro pub, and Bow Brickhill C of E primary school which is rated good by Ofsted. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, and public houses. There is a doctor and dentists' surgery. Further schooling can be found at Swallowfield primary school and Fulbrook extended secondary school.