Description
A modern five bedroom extensively refurbished and extended detached property, with a detached garden room/studio, an enclosed southerly facing rear garden, and off street parking. This property has 1,539 sq. ft. of versatile accommodation over three floors. On the ground floor there is an entrance hall, with access to a cloakroom, a utility room, and an L shaped kitchen/dining room with double doors to the garden. A door from the kitchen/dining room opens to a family room with double doors to the garden.
On the first floor there is a dual aspect sitting room overlooking the rear garden, two bedrooms and a three piece family shower room. The second floor has the principal bedroom with en suite shower room with a double wash hand basin, , two further bedrooms and a three piece family bathroom.
At the front of the property there is a block paved parking area for three cars.
Kitchen/Dining Room The kitchen is fitted with a comprehensive range of full height, wall, base, and drawer units, with complementary work surfaces, a Blanco grey single sink with a mixer tap, and concealed under unit lighting. Appliances include a free standing Samsung double door American style fridge/freezer, a Phillips Whirlpool dishwasher, an AEG fan oven and double oven, and an AEG five ring gas hob with stainless steel multi speed extractor fan over.
Rear Garden The rear garden is enclosed by fencing. A decked terrace spans the rear of the house with space for seating and a table and chairs for al fresco entertainment, and there is a lawn area, and wooden sleeper retained flower beds and shrub borders. The brick built garden/play room has an adjoining brick store/shed. There is a rear access gate from the back garden.
Situation and Schooling The Buckinghamshire village of Woburn Sands has a high street with shops, restaurants, and public houses. There are GP and dental surgeries and a monthly farmers' market held on the village green. Swallowfield Primary School and Fulbrook Extended Secondary School, are in Woburn Sands and both have a Good Ofsted rating. The village also has a daily bus service to the Harpur Trust Schools in Bedford, and Thornton, and Akeley Wood schools.