4 Bedroom House
£1,050,000
Hillway, Woburn Sands, MK17

Floorplans For Hillway, Woburn Sands, MK17
EPC Graph for Hillway, Woburn Sands, MK17

Description


A 1920s double fronted extended detached house with an established rear garden with countryside views, a detached garage and gated driveway parking, on a private road on the edge of Woburn Sands. This property has approximately 2,146 sq. ft. of accommodation over two floors. On the ground floor there is an entrance hall with a cloakroom, and access to the sitting room, the dining room, and the kitchen/breakfast/family room. An archway from the sitting room leads to the study and a door from the kitchen/breakfast/family room leads to the conservatory

The principal bedroom has a range of fitted bedroom furniture and a built under window seat. There are three further bedrooms - two with fitted furniture - and a five piece family bathroom.

At the front of the property, gates open to a gravelled driveway which leads to the single garage and the front door.


Ground Floor    The dual aspect sitting room has windows overlooking the front and rear gardens and a fireplace with an electric fire. The study and dining room both overlook the front driveway. The kitchen is fitted with a range of limed oak wall and base units, with complementary work surfaces and a white one and a half bowl sink with a mixer tap. There is a fridge/freezer and a dishwasher.

Rear garden    The rear garden overlooks open fields at the rear of the property. The garden is laid mainly to lawn with a patio adjacent to the house and has various gravelled seating areas throughout. It is well established with flower beds and mature shrubs and trees including an apple tree.

Situation and Schooling    The Buckinghamshire village of Woburn Sands has a high street with shops, restaurants, and public houses. There are GP and dental surgeries and a monthly farmers' market held on the village green. Swallowfield Primary School and Fulbrook Extended Secondary School, are in Woburn Sands and both have a Good Ofsted rating. The village also has a daily bus service to the Harpur Trust Schools in Bedford, and Thornton, and Akeley Wood schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250097

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields