4 Bedroom Terraced
£440,000
Sturdy Lane, Woburn Sands, MK17

Floorplans For Sturdy Lane, Woburn Sands, MK17
EPC Graph for Sturdy Lane, Woburn Sands, MK17

Description


A modern three storey mid-terrace townhouse with an enclosed decked rear garden, off street parking at the rear, and open countryside from the upper floor. This property situated on the edge of the Parkland development has approximately 1,209 sq. ft. of accommodation arranged over three floors. On the ground floor is a hallway with the staircase, a cloakroom, and doors leading to the open plan kitchen/dining/family/room, measuring over 25 ft. by over 15 ft., which runs the depth of the house and has windows at the front and rear.

On the first floor landing, doors open to a sitting room with double windows overlooking the rear garden, and the principal bedroom, which has an en suite shower room. Leading off the second floor landing, bedroom two has an en suite shower room, bedroom four has fitted wardrobes, and there is a further bedroom and a three piece family bathroom on this floor.

There is a south facing low maintenance rear garden, fully enclosed by timber fencing. This has a lower decked area and steps leading up to an upper deck. A garden gate at the end opens to the parking spaces.


Open Plan Kitchen/Dining/Family Room    The kitchen area is fitted with a range of contemporary gloss fronted wall, base, and drawer units. The worktops incorporate a breakfast bar with seating for two and a single drainer stainless steel sink with a mixer tap. Integrated appliances include a fridge/freezer, a dishwasher, a double electric oven, and a four a burner gas hob with an extractor over. There is a window overlooking the front and the family/dining area has a window overlooking and French doors opening to the garden decking.

Situation and Schooling    The Buckinghamshire village of Woburn Sands has a high street with GP and dental surgeries, shops, restaurants, and public houses. There is a monthly farmers' market held on the village green. There are two schools in Woburn Sands - Swallowfield Primary and Fulbrook Extended Secondary - and a daily bus service to Bedford, Thornton, and Akeley Wood schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250085

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields