Description
A modern three bedroom end of terrace house with an enclosed rear garden and driveway parking, 5 minute's walk from Woburn Sands High Street This property has approximately 748 sq. ft. of accommodation arranged over two floors. On the ground floor the front door opens to an entrance lobby with a staircase to the first floor and a door to the sitting/dining room. This room has access to a study and the fitted kitchen. On the first floor there are three bedrooms, two overlooking the rear garden and all with fitted wardrobes, and a three piece family bathroom with a shower over the bath.
Outside, there is off street, driveway parking for one car and a mature rear garden, enclosed by wooden fencing with hedged boundaries. It is laid mainly to lawn with a paved patio area, stocked beds and borders, and a timber garden shed.
Ground Floor The over 20 ft. long dual aspect sitting/dining room has a wooden floor, a dining area with ample room for a four-seater table, and is open to the kitchen. There is a study with a window overlooking the front and a storage cupboard. The kitchen is fitted with a range of wall, base and drawer units, wood effect worktops and a stainless steel one-and-a-half sink with a mixer tap. There is a built-in under oven with a hob and an extractor above. A door leads from the kitchen into the rear garden.
Situation and Schooling The Buckinghamshire village of Woburn Sands has a high street with shops, restaurants, and public houses. There is a GP surgery and a dental surgery, and a monthly farmers' market held on the village green. Swallowfield Primary School and Fulbrook Extended Secondary School, are in Woburn Sands and both have a Good Ofsted rating. The village also has a daily bus service to the Harpur Trust Schools in Bedford, and Thornton, and Akeley Wood schools.