3 Bedroom House
£795,000
Woburn Lane, Aspley Guise, MK17

Floorplans For Woburn Lane, Aspley Guise, MK17
EPC Graph for Woburn Lane, Aspley Guise, MK17

Description


A Victorian three bedroom detached and extended house with a mature rear garden, a garage and driveway parking in the centre of Aspley Guise. This period brick under slate double fronted house is situated in Woburn Lane in the village of Aspley Guise and following extension now has an approximate 1,609 sq. ft. of versatile accommodation arranged over two floors. On the ground floor there is an entrance hall with the original staircase and storage leading to an inner lobby currently used as a study area. There are also a sitting room and a family room at the front, a kitchen/dining room, a utility room, and a cloakroom.

Off the first floor landing the over 16 ft. deep principal bedroom has a dual aspect outlook and an archway leading to the en suite shower room. The two further bedrooms both have built-in wardrobes and share the family bathroom which is fitted with a four piece suite, including a bath and a separate shower.

The property is approached via a gravelled driveway, with parking for approximately four cars and providing access to a single garage.


Ground Floor Highlights    The dual aspect over 20 ft. by 13 ft. sitting room has double doors to the rear garden, and a brick fireplace with a period surround and an inset log burner. There is a family room overlooking the front and a study area. The kitchen is fitted with a range of wall, base and drawer units, work surfaces, and an inset sink with a mixer tap. There is a built-in double oven, a gas hob and space for a dishwasher and fridge/freezer. An archway opens to the dining room. The utility room is fitted with units, work surface, and a butler style sink. There are spaces for a washing machine and tumble dryer.

Outside    The mature rear garden is a secluded area, enclosed by fencing and mature trees, and slopes gently upwards towards the end. It is laid mainly to lawn with shrubs. There is a patio area adjacent to the rear of the house and steps lead up to a pathway which winds towards the rear of the garden. At the front there is a gravelled driveway enclosed by a low brick wall with railings.

Situation and Schooling    Aspley Guise is 1.5 miles from the town of Woburn Sands, which has a selection of shops, restaurants, and public houses. In Aspley Guise there is The Anchor public house and The Blue Orchid Thai Restaurant. There is a lower school in Aspley Guise - which has an Ofsted rating of Outstanding - and further primary and extended secondary schools in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250050

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields