3 Bedroom House
£525,000
Station Road, Woburn Sands, MK17

Floorplans For Station Road, Woburn Sands, MK17
EPC Graph for Station Road, Woburn Sands, MK17

Description


A Victorian three bedroom semi detached house with off street parking and a mature rear garden Built in the 1880s, this brick under slate property has approximately 1,473 sq. ft. of versatile accommodation arranged over two floors. On the ground floor there is an entrance hallway with a checkered tiled floor and the original staircase with turned balusters and an understairs cupboard. Doors off the hall lead to a sitting room, a dining room, and the kitchen/breakfast room, which accesses a utility room, leading to a downstairs shower room.

On the first floor the principal bedroom is at the front of the house, and has the original fireplace and a walk-in dressing room. There are two further double bedrooms - both with fireplaces - and a four piece family bathroom.

There is a gravelled driveway to the front with parking for two cars. The rear garden is laid mainly to lawn with a patio, mature trees and shrubs, a garden pond, and two brick-built outbuildings.

Agents Note; There are access rights through the back garden to neighbouring property.




Downstairs    The sitting room has a walk-in bay window overlooking the front and an open fireplace with a painted Victorian surround and a cast iron hearth. The dining room has a window looking into the hall and an open fireplace with a wood surround. The kitchen/breakfast room is fitted with a range of wall, base, and drawer units, work tops, a stainless steel sink with a mixer tap and an island unit. There is a double built-under oven, a gas hob with tiles behind and an extractor above, and a dishwasher.

Situation and Schooling    The Buckinghamshire village of Woburn Sands has a high street with GP and dental surgeries, shops, restaurants, and public houses. There is a monthly farmers' market held on the village green. There are two schools in Woburn Sands - Swallowfield Primary and Fulbrook Extended Secondary, both with Good Ofsted reports - and a daily bus service to Bedford, Thornton, and Akeley Wood schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250044

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields