5 Bedroom Detached
£800,000
Blind Pond Lane, Bow Brickhill, MK17

Floorplans For Blind Pond Lane, Bow Brickhill, MK17
EPC Graph for Blind Pond Lane, Bow Brickhill, MK17

Description


A modern five bedroom detached house with off street driveway parking, a garage, and an enclosed rear garden situated in the village of Bow Brickhill. This brick under tile property has approximately 1,919 sq. ft. of versatile accommodation arranged over three floors. On the ground floor there is an entrance hallway, a 22 ft. long sitting room with a contemporary inset fire and bi-fold doors to the patio and garden, a snug, an open plan kitchen/dining/family room, and a utility room leading to a cloakroom.

On the first floor the principal bedroom has an en suite bathroom. There are two further bedrooms on this floor, a study fitted with a range of office furniture, and a family bathroom.

There are an addition two bedrooms on the second floor, one with an en suite shower room and one currently used as a play room. Both rooms have Velux balconies overlooking the front and the play room also has a Juliet balcony with bi-fold doors and a glazed balustrade.


Kitchen/Dining Room    The over 21 ft. long kitchen/dining/family room has a tiled floor, a full height picture window overlooking and bi-fold doors opening to the enclosed rear garden. The kitchen is fitted with a range of gloss fronted wall, base, and drawer units, display shelving, worktops and an inset stainless steel sink. Appliances include a double oven, a microwave, a gas hob with extractor, a fridge/freezer, and a dishwasher. There are further units and a sink in the adjacent utility room.

Outside    At the front of the property, shrubs flank a pathway to the front door and a driveway leads to the garage. There is gated side access to the rear garden which is enclosed by brick walls or fencing. The garden is mainly laid to lawn, with raised brick-built flower beds and a paved patio/entertaining area which is adjacent to the side of the house and accessible from bi-folds in the two main reception rooms.

Situation and Schooling    Bow Brickhill is a small village with a 'gastro pub', The Wheatsheaf, and Bow Brickhill C of E primary school. The town of Woburn Sands is approximately 2 miles away and has a high street with shops, restaurants, and public houses. There are doctorsÂ’ and dentists' surgeries. Further schooling can be found at Swallowfield primary school and Fulbrook extended secondary school.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS250004

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields