Description
A 1930s four bedroom detached chalet bungalow with an in out driveway, a double garage and established gardens backing onto Aspley guise and Woburn Sands Golf Club. This brick property with a rendered façade under a clay tile roof, has approximately 2,023 sq. ft. of accommodation set over two floors. On the ground floor an entrance porch opens to an L-shaped hallway with an open fireplace and a picture window at the front. Doors open to a sitting room, a dining room, a kitchen/breakfast room with a walk-in pantry, and a utility room. The two main bedrooms are on the ground floor; an over 18 ft. by 15 ft. principal bedroom has an en suite cloakroom and the dual aspect bedroom two has an en suite bathroom. On the first floor there are two further bedrooms with access to the eaves and an over 30 ft. by 20 ft. attic room.
The front of property has a gravelled in out driveway leading to the double garage. The rear garden backs onto a golf club. There is a paved terrace adjacent to the rear of the property, a lawn area, and shrub beds and borders. Steps lead down to a further lawn.
The property needs modernization and refurbishment.
Ground Floor The nearly 17 ft. by over 16 ft. sitting room has a canted bay window with French doors opening to the rear terrace and a feature fireplace. The dining room overlooks the rear garden and has an original 1930s Art Deco tiled fireplace. The kitchen/breakfast room is fitted with a range of wall and base units, work tops and a stainless steel sink; there is a walk-in pantry and a door to a utility room. There is an AGA to remain. A further door in the kitchen accesses a secondary hallway with a door to the dining room and stairs to the first floor with an understairs cupboard.
Situation and Location Aspley Guise is a small village in Bedfordshire. In the village there is the Moore Place hotel, the Anchor pub and restaurant, and the Blue Orchid Thai restaurant. The nearby town of Woburn Sands is approximately 1.5 miles and has a selection of shops, restaurants, and public houses. There is a lower school in Aspley Guise - which has an Ofsted rating of Outstanding - and further primary and extended secondary schools in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.