3 Bedroom Detached
£430,000
Montgomery Way, Glebe Farm, MK17

Floorplans For Montgomery Way, Glebe Farm, MK17
EPC Graph for Montgomery Way, Glebe Farm, MK17

Description


A modern three bedroom detached house with off street parking and an enclosed rear garden on the outskirts of Wavendon village. This double fronted, three-year-old property has approximately 937 sq. ft. of accommodation arranged over two floors, including on the ground floor, an entrance hall, a dual aspect sitting room with a walk-in bay window, a kitchen/breakfast room with French doors opening to the garden and patio area, and a downstairs cloakroom.

The first floor landing accesses the principal bedroom which has an en suite shower room. There are two further bedrooms and a family bathroom.

At the front of the property, steps lead up to the front door and a lawned area enclosed by low hedging wraps itself around the house. There is a brick walled rear garden with a lawn, a patio and a garden shed. There is a private driveway to the rear of the garden with parking for two vehicles.



Kitchen/Breakfast Room    The entrance hall, with a downstairs cloakroom, accessed the dual aspect kitchen/dining room, which is fitted with a range of contemporary wall, base and drawer units with Quartz worktops and an inset double stainless steel sink with a mixer tap. There is an oven, a hob, and an extractor, as well as a fridge/freezer, a dishwasher, and a washing machine. Amtico Spacia flooring runs throughout the open plan room and French doors open to the rear garden.

Situation and Schooling    Wavendon is a Buckinghamshire village with a 13th-century church and a gastropub. Nearby Woburn Sands has a high street with shops, restaurants, and public houses. There is a GP surgery and a dental surgery, and a monthly farmers' market held on the village green. Swallowfield Primary School and Fulbrook Extended Secondary School, are in the village and both have a Good Ofsted rating. There is also a daily bus service to the Harpur Trust Schools in Bedford, and to the Thornton, and Akeley Wood schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS240117

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields