4 Bedroom House
£650,000
Station Road, Woburn Sands, MK17

Floorplans For Station Road, Woburn Sands, MK17
EPC Graph for Station Road, Woburn Sands, MK17

Description


A Victorian four bedroom extended and refurbished semi detached property with off street parking, 10 minutes' walk from Woburn Sands High Street. This Victorian property has a combined 1,807 sq. ft. of versatile accommodation arranged over two floors, including the outbuildings. The ground floor comprises an entrance hall accessing two separate receptions rooms: a sitting room with a walk-in box bay window and a log burner, and a family room (currently used as a games room), with a box bay window at the side. There is a modern, open plan kitchen/dining room, and an adjacent cloakroom.

On the first floor, the principal bedroom has a walk-in bay window and an en suite shower room. There are three further bedrooms, one is currently used as a study, and a family bathroom.

At the front is a low maintenance shingled garden partially enclosed by a picket fence and a driveway leading to the parking area.



Kitchen/Dining Room    The kitchen area is fitted with a range of off white gloss wall, base and drawer units, granite work tops and a double, inset stainless steel sink with a mixer tap. Integrated appliances include, a Bosch gas hob with an extractor, a Neff double oven, and a microwave. The kitchen is open plan to the dining area, which has ample space for a dining table and bi-folding doors opening to the patio and rear garden, overlooking the garden rooms.

Rear Garden    At the rear, a low maintenance, enclosed, courtyard style garden has a patio adjacent to the house and a central area of astro turf. At the end, there are two versatile garden rooms, one is currently used as a utility/laundry room and the other could be a home gym/office. A driveway provides off road parking along with an electric vehicle charging point.

Situation and Schooling    The Buckinghamshire village of Woburn Sands has a high street with GP and dental surgeries, shops, restaurants, and public houses. There is a monthly farmers' market held on the village green. There are two schools in Woburn Sands - Swallowfield Primary and Fulbrook Extended Secondary, both with Good Ofsted reports - and a daily bus service to Bedford, Thornton, and Akeley Wood schools.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS240064

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields