3 Bedroom House
£590,000
The Square, Aspley Guise, MK17

Floorplans For The Square, Aspley Guise, MK17
EPC Graph for The Square, Aspley Guise, MK17

Description


A period, refurbished three bedroom detached house with a rear courtyard and off street parking, situated in the village of Aspley Guise. The brick-built property has 1,304 sq. ft. of accommodation arranged over two floors and includes a self-contained shop at the front aspect, which could be converted to another reception room. On the ground floor there is a double height entrance hallway, a downstairs cloakroom, a sitting room, and an open plan kitchen/dining room.

On the first floor, the landing accesses the dual aspect principal bedroom with a vaulted ceiling and an en-suite shower room, there are two further bedrooms, a family bathroom, and a utility room.

Outside is a courtyard style patio area with planted raised beds at the side, and off road parking at the front.

The self-contained shop has a cloakroom and could be converted into a further living space, home office or possible business rental.


Property Highlights    The centre of the property is the kitchen/dining room, which is fitted with a range of white Shaker style units, marble worktops and splashbacks, and a butler’s sink. There is a breakfast bar, with seating for three and further under-counter storage. Integrated appliances include two ovens, a hob, a fridge/freezer, a dishwasher, and a washing machine. From the dining room, French doors open to a private courtyard area.

Situation and Schooling    Aspley Guise is a small village in Bedfordshire. In the village there is Moore Place hotel, the Anchor pub and restaurant, and the Blue Orchid Thai restaurant. The nearby town of Woburn Sands is approxiamately 1.5 miles and has a selection of shops, restaurants, and public houses. There is a lower school in Aspley Guise - which has an Ofsted rating of Outstanding - and further primary and extended secondary schools in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS230084

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields