4 Bedroom Detached
£650,000
Oak Barn Close, Cranfield, MK43

Floorplans For Oak Barn Close, Cranfield, MK43
EPC Graph for Oak Barn Close, Cranfield, MK43

Description


An extended four bedroom detached property with an en suite shower room, a double garage and parking for four cars, situated in a cul-de-sac of just 3 houses, on a corner plot in the village of Cranfield. The accommodation includes an L shaped entrance hall with an understairs storage cupboard, real wood flooring, a cloakroom, a sitting room with a feature fireplace, a bay window, and French patio doors to the garden, and a study. Also on the ground floor is an extended kitchen/dining/family room with real wood flooring and underfloor heating, and a utility area which has space for an American style fridge/freezer.

On the first floor there is a principal bedroom with built-in wardrobes and cabinets with solid walnut tops, a double airing cupboard with built-in storage, and an en suite shower room which has a corner shower cubicle, a wash basin, a WC, and tiled flooring. There are three further bedrooms, and a main fully tiled bathroom which has a panelled bath with a shower over, vanity storage cupboards incorporating a wash basin and a concealed cistern WC.

The property has double glazing, and a complete smart system central heating system with a less than a year old boiler.

Kitchen/Dining/Family Room    The kitchen area has a range of timber and high gloss wall and base units with matching work surfaces incorporating a one and a half bowl sink with a mixer tap over. Built-in appliances includes a double oven, a hob with an extractor over and a dishwasher. There is space in the utility area for an American style fridge/freezer, a washing machine and a tumble dryer. Real wood flooring with under floor heating continues into the dining/family room which has a pitched roof with four triple glazed electric Velux windows with integrated blinds, and double doors to the garden.

Outside    A block paved driveway provides parking for four cars leading to the detached insulated double garage which has electric security rated twin doors, fully carpeted, plastered roof/spotlights with full loft storage, an electric heater and lighting, and could be used as a home office if required. Gated access leads to the recently landscaped rear garden which has a paved patio entertaining area, an Astroturf lawn with raised shrub beds, a central garden feature with a water feature contained.

Situation and Schooling    Cranfield village has two public houses, a football club, a hairdresser, several take away restaurants, and two small supermarkets, one incorporating a post office. There is also a doctorsÂ’ surgery, a dental practice and pharmacy, two parks and a multi-use games area. Schooling is available at Cranfield Church of England academy, Holywell middle school, Wootton upper school and Bedford Harpur Trust schools.

Michael Graham

Michael Graham

24 St John Street
Newport Pagnell
Bucks
MK16 8HJ

+44 (0)1908 218860

Reference: mig-WBS230081

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields