4 Bedroom House
£725,000
Salford Road, Aspley Guise, MK17

Floorplans For Salford Road, Aspley Guise, MK17
EPC Graph for Salford Road, Aspley Guise, MK17

Description


A period four double bedroom semi detached house with a several original features situated in the centre within the Aspley Guise Conservation Area. The property has 1,373 sq. ft. of accommodation including, on the ground floor, an entrance hall, a sitting room, a dining room, a kitchen/breakfast room, a utility room, and a downstairs cloakroom.

On the first floor there is a dual aspect principal bedroom, bedroom two with a walk-in bay window and fitted wardrobes, two further bedrooms and a family bathroom.

To the front of the property, wrought iron gates open to a gravelled driveway with parking for numerous cars, which leads to the front door and the storage barn currently used as a garage. There is a lawn area, a circular patio and mature trees and hedging.

Agents Note: There is a partially completed extension which has been inspected by Building Control.

Ground Floor    The dual aspect sitting room has a wooden floor and a wooden fire surround with an electric fire. The dining room has double French doors to the front garden. The kitchen is fitted with a range of white gloss wall and base units, black granite worktops and an inset stainless steel sink. The breakfast room has a multi fuel burner with storage either side of the chimney breast.

Outside    The rear garden has a slate patio immediately to the rear of the house, a lawn area, a further paved patio in front of the work shop, a fish pond, mature borders, trees, and shrubs. There is a double height barn with an extensive mezzanine area which has development potential.

Situation and Location    The village of Aspley Guise has a small square with a Best Western Hotel, a Thai restaurant, and a gastropub. There is also a golf club between the village and Woburn Sands. It is only 1.5 miles from Woburn Sands which has a range of shops, public houses, and restaurants. The lower school in Aspley Guise has an outstanding Ofsted rating and there are further Primary and Extended Secondary schools in Woburn Sands. A daily shuttle bus runs to the Harpur Trust Schools in Bedford.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS220159

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields