4 Bedroom Detached
£945,000
High Street, Tingrith, MK17

Floorplans For High Street, Tingrith, MK17
EPC Graph for High Street, Tingrith, MK17

Description


Originally a farm workers cottage, significantly extended in early 1980s, a four bedroom detached house with a double garage, driveway parking, and an approximately 1 acre rear garden with views over open countryside. Situated in the hamlet of Tingrith, Willow Tree Cottage was formerly a farm cottage and lies on an approximately 1 acre plot with views across paddocks.

The accommodation includes on the ground floor; an entrance hall, a sitting room with an inglenook fireplace, a family/dining room, a kitchen/breakfast room, a fully fitted utility room with an integrated washing machine and tumble dryer, and a cloakroom.

On the first floor the principal bedroom has a roof terrace, a dressing room, and an en-suite bathroom. There are three further bedrooms - one currently used as a study - and a family bathroom.

The property is approached through electric gates to a walled front garden. A gravel driveway provides parking and turning space for numerous cars. This leads to a double width garage connected with light and power. Solar panels on the south side of the house provide an average income of approximately £1800.00 p.a.



Ground Floor    The dual aspect sitting room has windows to the front and rear, and an inglenook style open fireplace with a log burning stove. The kitchen/breakfast room is fitted with a range of oak base units, granite work surfaces and a one-and-a-half bowl, single drainer sink unit. Built in appliances include a Rangemaster oven and a dishwasher. The family room overlooks the rear garden and paddocks and has three arches leading to a dining area with views over the gardens.

Rear Garden    Immediately to the rear is a block paved terrace extending along the back of the property and forming a square, which is ideal for entertaining. The rear garden is private since the majority is enclosed by recently erected timber fencing. It is mainly lawned and stocked with a variety of shrubs and specimen trees including pear and apple. There are also two insulated outbuildings with fitted cupboards and double doors for mower access.

Situation and Schooling    Tingrith is a small hamlet located on the edge of the Duke of Bedford's Woburn estate with a Grade I listed church. The Georgian village of Woburn, which has a range of restaurants and public houses, is approximately 3 miles away. The town of Flitwick - with a wider range of facilities including a supermarket and leisure club - is less than 2.5 miles. There are middle and upper schools in Ampthill and Toddington, and the Harpur Trust private boys’ and girls’ schools are situated in Bedford.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS220137

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields