Description
A character four bedroom detached house set on 2.5-acre plot with gardens, paddocks, and a range of outbuildings including a stable block, garaging and off street parking in a rural position on the outskirts of a village. This brick under a mansard roof property is approached via a block paved driveway and is set within 2.5 acres of grounds and paddocks. It has approximately 2,602 sq. ft. of internal accommodation arranged over two floors. On the ground floor there is an entrance hallway with doors to an open plan space which includes a sitting/dining area, a family room with bi-fold doors to the patio and under floor heating, and a kitchen/breakfast room with an adjacent utility room, a study with French doors, a cloakroom/boiler room and a seperate W.C.
On the first floor, the principal bedroom has an en suite shower room and a range of fitted wardrobes, there are two further bedrooms - both with fitted wardrobes - and a family bathroom.
The property has a range of outbuildings including, barns and a stable block with stables, a double garage, an outside games room and a BBQ hub.
The sitting room, dining room, family room, kitchen, and bedrooms one and two all benefit from air conditioning
Ground Floor Accommodation The over 50 ft. wide open plan ground floor space spans the width of the property and comprises three reception areas. The dual aspect sitting area has a fireplace with a log burner, parquet flooring and is open to the dining area. The family area has three sets of bi-fold doors to the rear patio and garden and two skylights. The kitchen/breakfast room is fitted with a range of white contemporary base and wall units, granite worktops, and a stainless steel sink with a mixer tap. Appliances include an oven, an oven/microwave, an induction hob with extractor, a fridge/freezer, a wine fridge, and a dishwasher.
Grounds The private rear garden is laid mainly to lawn with various paved patio and seating areas and established planted beds, and is enclosed by mature trees and shrubs. A post and rail fence beyond formally clipped trees separates the garden from the paddocks. In the grounds, the larger outbuilding has a snooker room with heating and a WC as well as the double garage and sheds. The BBQ room overlooks the lawn and has fitted units, a fridge, a freezer, and a BBQ.
Situation and Schooling Hulcote is part of the Hulcote and Salford civil parish in Bedfordshire. The Mary Agate Hall - Hulcote and Salford's village hall - is located on the east side of Wavendon Road, directly opposite the Swan public house and restaurant. Woburn Sands (2 miles) has a monthly farmers market, GP and dental surgeries, two schools and a high street with shops, public houses, and restaurants.