4 Bedroom House
£750,000
High Street, Tingrith, MK17

Floorplans For High Street, Tingrith, MK17
EPC Graph for High Street, Tingrith, MK17

Description


A four bedroom detached extended former farm cottage with an enclosed rear garden, an in out driveway with off road parking and a detached double garage, situated in the village of Tingrith. This extended property has approximately 2,464 sq. ft. of versatile accommodation arranged over two floors. On the ground floor there is a glazed entrance porch opening to an open plan sitting/dining room with a brick fireplace housing a multi fuel stove and bay windows over the front. The separate, triple aspect family room has a brick-built bar, and the snug, also with a bay window, has an open fireplace. The updated kitchen/breakfast room is open plan to the conservatory and there is an office, a utility room, and a shower room.

On the first floor, the principal bedroom has a range of fitted wardrobes and a four piece en suite bathroom. There are three further bedrooms - one over 22 ft long - and two of which have fitted wardrobes. The newly fitted three piece family shower room is fully tiled.

At the front of the property is an in out driveway with parking for several vehicles and there is a double garage at the rear.


Kitchen and Conservatory.    The kitchen is fitted with a range of contemporary wall, base and drawer units, glazed display units and pull-out units, with granite work surfaces and an inset sink with a mixer tap. There is a fitted double oven, a hob with an extractor over, a microwave, a dishwasher, and a wine chiller. The kitchen area accesses the utility room, which has a door to the rear garden, and has a walk through to the conservatory. This room has a continuation of the wood effect flooring as well as under floor heating. The conservatory overlooks the garden and has French doors to the deck.

Outside    The rear garden, enclosed by brick walls, is laid mainly to lawn and has a raised decked area adjacent to the house, accessed from the conservatory, with steps leading down to the lawn. There are further paved and shingled seating areas as well as beds and shrub borders. There is a greenhouse and a timber gate gives access to the double garage.

Situation and Schooling    Tingrith is a small hamlet located on the edge of the Duke of Bedford's Woburn estate with a Grade I listed church. The Georgian village of Woburn, which has a range of restaurants and public houses, is approximately 3 miles away. The town of Flitwick - with a wider range of facilities including a supermarket and leisure club - is less than 2.5 miles. There are middle and upper schools in Ampthill and Toddington, and the Harpur Trust private boysÂ’ and girlsÂ’ schools are situated in Bedford.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS210112

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields