Description
A modern three bedroom semi detached house with a garage, driveway parking and L-shaped rear garden. This property has 796 sq. ft. accommodation which includes on the ground floor an entrance hall, a sitting room and a kitchen/dining room.
On the first floor the principal bedroom has an en suite shower room. There are two further bedrooms and a family bathroom.
The front garden is planted with low level shrubs
and there is a path to the front door. There is driveway parking for two cars and a single garage. The south facing rear garden is laid to lawn with shrub borders and a patio.
Ground Floor The sitting room has a window with wooden shutters to the front and solid oak flooring. The kitchen/dining room is fitted with a range of grey fronted wall and base units, worktops, and an inset stainless steel one and a half bowl sink and drainer. Integrated appliances include a four burner gas hob with extractor over, a built under single oven, a fridge/freezer, a dishwasher and a washing machine.
Location and Schooling The Buckinghamshire village of Woburn Sands has a high street with shops, restaurants and pubs. Swallowfield lower school and Fulbrook middle school are located in Woburn Sands and there is a daily bus service to the Bedford Harpur Trust schools, Thornton College and Akeley Wood School. Milton Keynes Central railway station - with services to Euston taking 35 minutes - is approximately 8 miles away and M1 junction 13 is approximately 3.5 miles.