3 Bedroom House
£599,995
Walton End, Wavendon Gate, MK7

Floorplans For Walton End, Wavendon Gate, MK7
EPC Graph for Walton End, Wavendon Gate, MK7

Description


An extended and updated three double bedroom semi detached house with driveway parking and an enclosed rear garden situated on a no through lane which was once part of the old Wavendon village. This property has approximately 1,645 sq. ft. of accommodation arranged over two floors. On the ground floor, the front door, accessed via a porch with exposed timbers, opens to an entrance hallway with the staircase to the first floor, an understairs cupboard and a two piece cloakroom. A sliding pocket door opens to the snug/guest bedroom. A walk through leads to an open plan kitchen/dining/sitting room with underfloor heating. Overlooking the front, with a Velux window, the snug/guest bedroom accesses a refitted shower room.

The first floor landing accesses all three bedrooms and the family bathroom with a centrally placed panel bath, twin wash basins and, like the principal bedroom, a window overlooking the rear garden.

At the front of the property a gravelled drive with a gate to a side access, has a garage style store and parking for up to four cars. The rear garden is laid to lawn and has a paved patio. There is a constructed home office/studio with a cloakroom.

Ground Floor Highlights    Part of the open plan kitchen/dining/family area, the over 22 ft. long sitting area has a vaulted ceiling, wood panelling along one wall and underfloor heating. A picture window overlooks the rear garden and at the side, double French doors with flanking windows open to the patio. The kitchen/breakfast/dining area, is fitted with a range of contemporary gloss fronted floor to ceiling units, an island/breakfast bar with an inset hob and sink, and a range of integrated appliances. French doors open to the patio and there is a pair of skylights above.

First Floor Highlights    The principal bedroom is situated at the rear of the house with views over the garden. Bedroom two, which like bedroom three has windows overlooking the front, is currently used as a dressing room and has a range of dark wood effect hanging spaces, open shelves, and drawers. The family bathroom is fitted with a tiled bath with a shower over, twin round ceramic wash basins in a vanity unit, and a WC.

Situation and Schooling    Nearby leisure facilities include Caldecotte Lake (approximately 1 mile) and Windmill Hill Golf Centre (approximately 3 miles). Walnut Tree Medical Surgery and local convenience shops are less than 1 mile away. Wavendon Gate School take children from 4 to11 years and the property is in catchment for Walton High School for secondary education.

Michael Graham

Michael Graham

2 Aspley Hill
Woburn Sands
Buckinghamshire
MK17 8NJ

+44 (0)1908 586400

Reference: mig-WBS180057

Request a viewing for this property

Simply fill out the form below or alternatively call us on 020 7839 0888

* Mandatory fields